Discuss special challenges faced in controlling R & D activities and possible management initiatives
Type of financial control:
The financial control exercised in a discretionary expense center is quite different from that in engineered center the latter attempts to minimize operating cost by setting a standard and reporting actual costs against this standards. The main purpose of a discretionary expense budget on the other hand is to allow the manager to control Cost for particular in the planning. Costs are controlled primarily by deciding what task should be undertaken and what level of effort is appropriate for each.

Thus in a discretionary expense center financial control is primary exercised at the planning stage before the amount are incurred.

Measurement of performance:
The primary job of the manager of a discretionary expense center is to accomplish the desired output spending an amount that is on budget is satisfactory. This is in contrast with the report in an engineered expense center which helps higher management to evaluate the manger efficiency. If these two types of responsibility center are carefully distinguished management may treat the performance report for the discretionary expense center as if it were an indication of efficiency Control over spending can be exercised by requiring that the manger approved be obtain before the budget is over sometimes a certain percentage of overrun is permitted without additional approval if the budget really set forth the best estimate of actual cost there is 50 percent probability that it will overrun and this is the reason that some latitude is often permitted.

Control problems:
The control of R & D centers, which are also discretionary expense center is difficult for the following at least a semi tangible output reasons.1.Results are difficult to measure quantitatively. As contrasted with administrative activities, R&D usually has at least a semi tangible output in patent, new products, or new processes. Nevertheless,the relationship of these outputs to inputs is difficult to measure and appraise. A complete product of an R&D group may require several year of effort; consequently input as stated in an annual budget may be unrelated to outputs.Even if an output can be identified a reliable estimate of its value often cannot be made. Even if the value of the output can be calculated, it is usually not possible for management to evaluate the efficiency of the R&D effort because of its technical nature. A brilliant effort may come up against an insuperable obstacle, whereas a mediocre effort may, by luck result in a bonanza.2.The goal congruence problem in R&D center is similar to that in administrative centers. The research managers typically want to build the best research organization that money can buy, even though this is more expensive than the company can afford. A further problem is that research people often may not have sufficient knowledge of the business to determine the optimum direction of the research efforts.3.Research and development can seldom be controlled effectively on an annual basis. A research project may take year s to reach fruition, and the organization must be built up slowly over a longtime period. The principal cost is for the work force obtaining highly skilled scientific talented is often difficult, and short term fluctuation in the work force are in efficient. It is not reasonable,therefore to reduce R&D costs in years when profits are low and increase them in year when profits are high. R&D should be looked at as a long term investment not as an activity that varies with short run corporate profitability.

The R&D continuum:
Activities conducted by R&D organization lie along a continuum. At one extreme is basic research; the other extreme is product testing. Basic research has two characteristics: first, it is unplanned management at most can specify the general area that is to be explored second there is often a very long time lag before basic research result in successful new product introductions.Financial control system has little value in managing basic research activities. In some companies, basic research in included as a lump sum in the research program and budget. In others, no specific allowance is made for basic research as such; there is an understanding that scientists and engineers can devote part of their time to explorations in whatever direction they find most interesting, subject only to informal agreement with their supervisor.For product testing projects, on the other hand, the time and financial requirement can be estimated,not as accurately as production activities.
 